Bridges

Highway Bridges

Langensand Bridge, Luzern (2006: Prognosis, 2008: Modal Analysis, Operational dynamic behavior, 2012: Operational dynamic behavior)

Niedersachsen Bridge Tostedt (2007/08, Modal Analysis for baudyn GmbH, Hamburg (G))

Sidegga Bridge, A9-Simplon-Motorway (2006, Operational dynamic behavior)

A2 Baldegger Bridge, Basel, (2006, Operational dynamic behavior)

Calancasca Bridge, Val Calanca GR (2004, Operational dynamic behavior)

Tremblet (2003, Dynamics of extremely heavy vehicles)

Bridge A110, Langenthal, (Modal Analysis, Dynamics when using vibratory rollers to place pavement)

A2-Bridge Obkirchen, Hergiswil (2001, Planning, Test manager)

Railway Bridges

RhB-Railway and Highway bridges Russein, Val Russein GR (2012/13/14, Vibration monitoring, 6 plus 2 plus 2 months)

SBB-Bridge Eglisau (2009, Planning of longterm montoring)

ICE-Bridge Erfttal, Köln-Aachen (2007, Modal Analysis)

Footbridges

Passerelle piétonne sur La Sarine à Broc (FR), (2014/15 Tutoring of Nathalie Rohner, MSc Thesis, U. of Applied Sciences Fribourg, Supervision: Prof. M. Devaux. Modal Analysis, especially damping estimation procedures, operational dynamic behavior)

Cable-Stayed Footbridge Oberwies, Wallisellen (2011/12, Modal Analysis of main grider and cables, operational dynamic behavior)

Dag Hammarskjöld Bridge, Hamburg (2011, Modal Analysis for baudyn GmbH, Hamburg (G))

Bifang Bridge Brittnau AG (2010, Prognosis, TMD dimensioning)

Erstfeld Footbridge (2008, Operational dynamic behavior)